The Westmoreland County Historical Society and the County of Westmoreland commissioned this project in 2017. The project involved new construction of Phase I of the Historical Education Center along with a complete rehab of an existing farmhouse. Site Clearing, Earthwork, Site Utilities and Site Improvements rounded out the project. The structure was load bearing metal framing with pre-engineered metal trusses, standing seam roof, aluminum windows, Fiber Cement Siding and manufactured stone veneer.
![Outflow Level Spreader](https://static.wixstatic.com/media/924079_9d6bbe07ddbc4fb4a570dcadbd28ccda~mv2_d_4032_3024_s_4_2.jpg/v1/fill/w_147,h_110,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/924079_9d6bbe07ddbc4fb4a570dcadbd28ccda~mv2_d_4032_3024_s_4_2.jpg)
Construction of the detention pond outflow and level spreader for stormwater retention
![Detention Pond](https://static.wixstatic.com/media/924079_6cf9599281a049419e141d42d0de3fb9~mv2_d_8042_3868_s_4_2.jpg/v1/fill/w_147,h_71,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/924079_6cf9599281a049419e141d42d0de3fb9~mv2_d_8042_3868_s_4_2.jpg)
Pond slopes seeded with wildflowers. The bottom will be filled with retention mix and wildflowers.
![IMG_2977](https://static.wixstatic.com/media/924079_105a20ae091544cbb28332d187df34ff~mv2_d_4032_3024_s_4_2.jpg/v1/fill/w_147,h_110,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/924079_105a20ae091544cbb28332d187df34ff~mv2_d_4032_3024_s_4_2.jpg)
![Outflow Level Spreader](https://static.wixstatic.com/media/924079_9d6bbe07ddbc4fb4a570dcadbd28ccda~mv2_d_4032_3024_s_4_2.jpg/v1/fill/w_147,h_110,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/924079_9d6bbe07ddbc4fb4a570dcadbd28ccda~mv2_d_4032_3024_s_4_2.jpg)
Construction of the detention pond outflow and level spreader for stormwater retention